pageheaderrestoreproj.jpg

pageheaderSUBlock60.jpg

With strong regional support, SCA developed the vision of returning the entire Mont Clare canal site into the way it was at the height of the canal era. At the same time that it undertook to restore The Locktender's House,  it set the goal of restoring its other historic feature at the head of the canal: Lock 60. The enlarged lock, built in 1846, was 100’ long and 18’ wide.

 

lock 60 1907.jpg

 

A 1907 postcard shows the grand masonry lock still open, with big timber gates at both ends and a small truss bridge across it. The mule driver of the canal era had to lead his mules across the bridge to stay on the towpath. The postcard also shows the little shanty by the bridge, where he stopped to pay the toll. This postcard became the model for the restoration.

Restoring the lock would be a larger, more complex job than restoring the house. The watered masonry chamber was still impressive, but its north end was dammed by the dirt fill that replaced the bridge and supported the driveway to the Locktender’s House, and its gates were long gone. The first step was to drain the chamber and dredge out several tons of muck  in order to explore its condition under water.

 

This feasibility study was funded by a 1997 grant from The William Penn Foundation. To everyone’s relief, the chamber was found to have a remarkably preserved timber floor and only minor cracks and one leak in its walls. In 1998 a second William Penn Foundation grant and another from the PA Department of Conservation and Natural Resources provided funds for design and engineering plans for the project. In 1999 a large federal TEA-21 grant was awarded to fund construction, with PennDOT and the Delaware Valley Regional Planning Commission appointed to serve as managers.  

Designing and fabricating a truss bridge that would look like its 1820’s original but would nevertheless accommodate today’s vehicles and win PennDOT’s approval proved to be the work of several years. So was designing and fabricating the huge timber miter gates that would fit exactly in the old masonry recesses for them, and be watertight when closed. The job was a challenge for 20th century engineers unversed in lock design. Completion date was first targeted for 2002, was postponed to 2003, and again to the spring of 2004. The job was actually completed in February of 2005. The construction crews that had worked on it for a year bade a friendly farewell that month and departed. SCA waited for the warm, sunny day of May 1st to hold its grand public opening. The ceremony was attended by the state officials who had had a part in the lock’s construction, by our state and U.S. representatives, and by hundreds of SCA sponsors, members and well-wishers. Nearly fifty canoes and kayaks were “locked through” the lock that afternoon.

sidebartowpathright.jpg

pageheaderSUBcanal.jpg

The canal itself has always played a vital role in the community. The land below Lock 60 is floodplain. When the Schuylkill River floods, the canal is a large catch basin for the rising water, lessening the danger of flooding for the many properties that border the canal in Mont Clare and Port Providence. It is also the only source of water for fire companies to draw on in times of fire in the area. However, as a man-made ditch dug in the earth it is subject to constant deterioration. By the time SCA entered the scene in the 1980s the canal’s banks were eroded, the simple earthen berm on its river side that kept the water in its bed had serious leaks from muskrat holes and decayed tree roots, old spillways were broken, and the controls and sluice gates at its inflows and outflows were rusted and inoperable.

SCA’s earliest major investment in the canal was the construction in 1995 of a $12,000 spillway at the foot of the canal. It replaced corroded underground conduits that had been leaking for years. This was a large fund-raising achievement before the day of Heritage Park grants. Than in 2000 two storms caused two major successive breaches in the berm, both causing canal waters from Lock 60 down to drain away into the river. These events galvanized SCA to take aggressive measures to stabilize the canal’s banks, preserve its flow and control its water levels.

In the first of the 2000 storms a simple stone spillway in the lower canal, opposite Canal St. in Port Providence, gave way. The second storm opened up the weir opposite the Locktender’s House, creating a huge opening through which all canal waters almost immediately gushed out. The old spillway was soon repaired, but making the weir function as it should was a much bigger project. The weir had given SCA trouble from the first. Reconstructed in the 1950s by DER, Bureau of Forests & Waterways, it consisted of two side-by-side underwater conduits through the berm, through which water could flow from the canal into the river. The conduits had once upon a time had a watertight gate across their canal ends that could be raised or lowered, enabling the canal’s caretaker to adjust the amount of water exiting the canal. Thus the weir had the vital function of acting as a sort of safety valve in times of flood or drought. The amount of water in the canal could be adjusted by raising or lowering the gate. By SCA’s time, however, the operating gate had long since deteriorated. SCA kept trying to fasten big plywood boards or sheets of metal in front of the gates, but they would be carried away by storms. In 2001 a PA Department of Environmental Protection Growing Greener grant provided funding to bring the weir thoroughly up to date. Modern state of the art gates are now in place, one for each conduit. They are controlled by the upright posts that are conspicuous along the towpath. The major erosion of the banks around the old conduit housing has been held at bay with rip rap. Later a Delaware Estuary Partnership grant cooperated with SCA in revegetating the further weir bank to the river. The point of land at the weir estuary is a favorite spot of fishermen.

Other improvements of the last few years have been strengthening the landside guardwall in the forebay just above Lock 60, and, at the mouth of the first ravine, providing a channel to divert excessive storm water from the stream to reduce the amount of sediment deposited into the forebay. Replacing the rusted underwater sluice gate that governs the conduit that delivers all the canal’s waters from the forebay above Lock 60 to the canal head below Lock 60. The Twin Lock Gate, its technical name, is a conduit that runs through the smaller of the two chambers that once composed the lock. The entire chamber is now out of sight, long buried under fill.

Long-range plans include a similar modern sluice gate at the outflow of the canal at its foot, where it flows into the small stream that takes its waters back to the river.

 

 

 

 

Copyright 2016 Schuylkill Canal Association. All rights reserved.

Powered by Wild Apricot Membership Software